Focusing on hotel energy bills
Focusing on hotel energy bills
Information
How cool pool controls can save money...
How cool pool controls can save money...
Sun, sea and energy...
Duni Royal Resort is a high-class holiday village located on the southern Black Sea coast of Sozopol. The resort occupies a total area of 740 000 square metres around a beautiful bay and a nature reserve.
Looking at the longer-term impact
Akaa in Finland set out to improve the energy efficiency of its municipal buildings by launching a special project based on the Energy Services Company (ESCO) model.
Construction waste is basically material loss that creates additional cost, and minimising waste generation directly improves the cost-efficiency of the project. Successful construction site waste management is a sum of many factors. This checklist covers many of these different factors:
Service model, an incentive to succeed
In 2014, a hospital in Karlovac Croatia was renovated according to energy service company (ESCO) practices. The renovation was part of the larger Energy Renovation of Public Sector Buildings programme, adopted by the Croatian government.
Designing out waste is a concept of minimising the life cycle waste of a building by considering design options for reducing waste in each stage: construction, refurbishment, and demolition or deconstruction.
Better comfort and safety for the little ones
The local government of Chmielnik in Poland modernised a state nursery in 2019. The original building was built in the 1950s and 1960s and was in poor condition. The building was renovated in 1998 but it still lacked modern heating installations. High energy losses were proving costly.
Healthy approach to energy...
Klinikum Frankfurt Hoechst is building the world’s first hospital to meet the passive house standards. The new building replaces the old and inefficient 1960s hospital and running costs are expected to reduce significantly.
Passive House is a building that does not require much conventional building heating on account of its thermal insulation and airtightness with very energy-efficient windows and ventilation system. Passive house uses more often electrical heating with air heat pump because of low heating energy consumption. However, a passive house can even be connected to a geothermal heat pump.
An impeccable outcome!
The Mustola Timber sawmill in eastern Finland has 11 employees and a yearly production volume of 50 000 m3. Their goal is to steadily increase production. To achieve the full growth potential, they need to maximise the recovery rate of valuable raw material in production.